Pre-fabricated modular hospital (infectious diseases hospital)

Client: «KAZPACO (КАЗПАКО)» BI Group

  • Project design
  • Equipment delivery
  • Installation
  • Software programming

  • Building automation system based on Schneider Electric EcoStruxureTM Building Operation series of software and hardware

Functional components:
  • Monitoring of pumping station for drinking water and fire suppression (1 unit)
  • Monitoring of heating plant (2 DHW pumps, 2 water heating pumps)
  • Monitoring parameters of Danfoss ECL regulated heating valves
  • Supervision of germicidal air treatment filters (84 units)
  • Monitoring of a chiller (1 unit)
  • Monitoring of cold water supply system
  • Supervision of circulation pumps (2 + 1 pumps)
  • Supervision of air handling units (12 units)
  • Monitoring of a diesel generator plant (1 unit)
  • Monitoring boiler plant: 3 DHW, 3 mainline pumps, 2 boost pumps
  • Monitoring of chlorination plant, 2 air blowers, 2 diluter pumps
  • Monitoring of a sewage pumping station
  • Control of parameters of a vacuum station (med. gases) (1 units)
  • Monitoring of hemodialysis station (1 unit)

Functional capacity: 1200 data points