Client «U-Con Three» (BI Group)
Project design
Equipment delivery
Installation
Software programming
Building automation system based on Schneider Electric EcoStruxureTM Building Operation software and hardware platform
Functional components of the automation system:
Supervision of air handling units (11 AHU, 10 Air Supply units)
Supervision of air exhaust fans (25 units)
Supervision of electrical lighting (137 groups)
Supervision of heating plant (4 DHW and 8 circulation pumps)
Supervision of fan coil controllers (164 units)
Supervision of cold water pumps (6 units)
Monitoring automated drainage pits (3 units)
Power management system based on Shcneider Electric Power Monitoring Expert (PME), with the following components: 29 power meters
Functional scale of the project: 2100 data points