Pre-fabricated modular hospital for 200 patients
тг.
тг.
Client: «KAZPACO (КАЗПАКО)» BI Group
Project design
Equipment delivery
Installation
Software programming
Building automation system based on Schneider Electric EcoStruxureTM Building Operation software and hardware platform
System functionality:
Monitoring of pump sets for drinking water and fire suppression (1 unit);
Monitoring and control of germicidal air treatment filters (56 units);
Monitoring of chillers (3 units)
Monitoring of cold water supply system
Supervision of circulation pumps (2 + 1 pumps)
Supervision of air handling units (12 units)
Monitoring of a diesel generator plant (1 unit)
Monitoring of a boiler plant, including DHW, heating and external circuits
Monitoring of chlorination plant
Monitoring of sewage pumping station
Control of compressor (medical gases) (2 units)
Monitoring of hemodialysis station (1 unit)
Functional capacity of the project:
1500 data points