Pre-fabricated modular hospital for 200 patients
тг.
тг.
Client: «KAZPACO (КАЗПАКО)» BI Group
Project design
Equipment delivery
Installation
Software programming
Building automation system based on Schneider Electric EcoStruxureTM Building Operation software and hardware platform
Состав системы:
Monitoring of pump sets for drinking water and fire suppression (1 unit);
Monitoring of heating plant, 2 DHW pumps, 2 water heating pumps
Monitoring parameters of Danfoss ECL regulated heating valves
Monitoring and control of germicidal air treatment filters (84 units);
Monitoring of a chiller (1 unit)
Monitoring of cold water supply system
Supervision of circulation pumps (2 + 1 pumps)
Supervision of air handling units (12 units)
Monitoring of a diesel generator plant (1 unit)
Monitoring boiler plant: 3 DHW pumps, 3 mainline pumps, 2 boost pumps
Monitoring of chlorination plant, 2 air blowers, 2 diluter pumps
Monitoring of a sewage pumping station
Control of medical vacuum station (med. gases) (1 unit)
Monitoring of hemodialysis station (1 unit)
Functional capacity of the project: 1500 data points