Go back
Class-A Office Building “Office Q2”
тг.
тг.
Client: Branch office «Bazis»
Project design
Equipment delivery
Installation
Software programming
Building Automation system based on Siemens DESIGO PX series and Siemens Desigo Insight SCADA software
Automated, supervised or monitored equipment:
Cooling towers controlled by Desigo PX with automation logic developed by our own team
Air handling units controlled by Pixel series controllers integrated into Desigo PX via Modbus
Water-air heat pumps: Carrier Aquazone controlled by Schneider Electric TAC MN100 LON DDC controllers, integrated via Lonworks (301 units)
Water-water heat pumps: Carrier Aquazone controlled by TAC MN100 LON DDC, integrated into Desigo PX via Lonworks (5 units)
Heating plant with automated weather-aware functions, controlled by Danfoss ECL controllers, integrated into Desigo PX via Modbus
Supervised drinking water supply and cold water supply
Supervised interior and exterior electric lighting
Functional scale: 5120 data points
Installation of an automated pumping station for sprinkler-based fure extinguishing system.
Installation of automated gas fire extinguishing for 3 server rooms
Left
Right