Class-A Office Building “Office Q2”

Client: Branch office «Bazis»

  • Project design
  • Equipment delivery
  • Installation
  • Software programming

  • Building Automation system based on Siemens DESIGO PX series and Siemens Desigo Insight SCADA software

Automated, supervised or monitored equipment:
  • Cooling towers controlled by Desigo PX with automation logic developed by our own team
  • Air handling units controlled by Pixel series controllers integrated into Desigo PX via Modbus
  • Water-air heat pumps: Carrier Aquazone controlled by Schneider Electric TAC MN100 LON DDC controllers, integrated via Lonworks (301 units)
  • Water-water heat pumps: Carrier Aquazone controlled by TAC MN100 LON DDC, integrated into Desigo PX via Lonworks (5 units)
  • Heating plant with automated weather-aware functions, controlled by Danfoss ECL controllers, integrated into Desigo PX via Modbus
  • Supervised drinking water supply and cold water supply
  • Supervised interior and exterior electric lighting

  • Functional scale: 5120 data points
  • Installation of an automated pumping station for sprinkler-based fure extinguishing system.
  • Installation of automated gas fire extinguishing for 3 server rooms