Go back
Palace of Schoolchildren, Turan District
тг.
тг.
Client:
BI Construction Turkestan LLP (BI Group)
Scope of work:
Design
Equipment supply
Installation
Programming
Systems implemented:
Access Control System (ACS)
— equipment by
Schneider Electric
, based on Security Expert
Public Address and Voice Alarm System (PAVA)
— equipment by Rubezh LLC
Automatic Gas Fire Suppression System
— equipment by Konsel LLP
Automatic Fire Alarm System (FAS)
— equipment by Rubezh LLC
Building Management System (BMS)
— based on EcoStruxure™ Building Operation by Schneider Electric
Structured Cabling System (SCS)
— equipment by Huawei and ITK
Left
Right